U of C Residence Towers Foundation and Excavation

Ironclad was subcontracted by CANA Management for the U of C Residence Towers project at the University of Calgary, handling high-rise foundation excavation of over 40,000 m3.

KEY DETAILS

Contract Value

$1,450,900

Project Owner

University of Calgary

Completion Date

September 2018

Project Role

Prime Contractor

Scope of Work

  • 40,000 cubic meters of bulk excavation.
  • Topsoil stripping and disposal.
  • Slab on grade preparation
  • Detailed excavation.
  • Backfill.
  • Final site grading.

No items found.

Resources & Challenges

  • Total Crew: 12 Persons
  • Equipment Used:
    4 Excavators, 2 Loaders, 1 Dozer, 1 Skidsteer, 25 Highway Trucks.
  • Challenges:
    The project faced challenges with a design-build foundation structure and heavy pedestrian traffic. Last-minute design changes and multiple concurrent work sites required Ironclad to accelerate the work and deploy several crews to complete excavation and backfill for the simultaneous construction of two residential towers.

Project Timeline

//   May 2023

Drilling & Pressure Grouting

//   May 2024

Sheet Pile Core Wall & Concrete Work

//   July 2024

Embankment Structure

//   September 2024

Spillway and Concrete Work

//   October 2024

Final Dam Commissioning

TESTIMONIAL

Having worked with the entire Ironclad team for many years and over multiple projects has resulted in a strong and mutually respectful working Relationship. Ironclad has become the “go to guys” for all of my projects, big or small.

Randy Anda, Cana Construction | U of C Residences