Instream Works
Stoney 22X Instream Berm and Bridge Construction
Ironclad partnered with PCL Construction to complete a bridge construction project over the Bow River in Calgary, Alberta that required significant instream berms to complete over a two year period.
KEY DETAILS
■
Contract Value
$4,607,800
■
Project Owner
Alberta Transportation
■
Completion Date
October 2024
■
Project Role
Subcontractor
Scope of Work
- Instream access berms.
- Riprap berm protection.
- Detailed excavation and backfill.
- Concrete slope protection.
- Demolition of existing bridge.
Resources & Challenges
- Total Crew: 12 Persons
- Equipment Used:
5 Excavators, 2 Loaders, 1 Dozer, 1 Compactor, 1 Skidsteer, 20 Highway Trucks.
- Challenges:
To meet the project schedule there was significant instream berm installation and removal scopes within specified fish windows that needed to be completed on time, which required an execution team that was very experienced with instream construction work.